Open mobile menu
Close mobile menu

For the latest cost of living support

Find out more

Application 4/25/2110/0F1

Application Details

Valid Date: 
25 Mar 2025
Proposal: 
ERECTION OF 95 DWELLINGS WITH ASSOCIATED INFRASTRUCTURE
Site: 
LAND AT PARKSIDE ROAD, CLEATOR MOOR
Applicant: 
Genesis Homes
Agent: 
SRE Associates
Case Officer: 
Chris Harrison
Parish: 
Arlecdon & Frizington
Cleator Moor

Plans & Documents

AttachmentSize
PDF icon Application Form508.93 KB
PDF icon Site Location Plan - SUPERSEDED178.31 KB
PDF icon Site Block Plan159.26 KB
PDF icon Site Framework Plan - SUPERSEDED2.8 MB
PDF icon Housing Schedule Plan - SUPERSEDED648.72 KB
PDF icon Site Illustrative Masterplan - SUPERSEDED9.26 MB
PDF icon Site Massing Plan - SUPERSEDED416.71 KB
PDF icon Surface Materials Plan - SUPERSEDED771.93 KB
PDF icon House Materials Plan - SUPERSEDED516.88 KB
PDF icon Boundary Treatment Plan - SUPERSEDED434.28 KB
PDF icon Garden Areas Plan - SUPERSEDED434.05 KB
PDF icon Car Parking Plan - SUPERSEDED457.72 KB
PDF icon Refuse and Recycling Plan - SUPERSEDED766.07 KB
PDF icon Affordable Housing Plan - SUPERSEDED411.47 KB
PDF icon Technical Design Plan - SUPERSEDED1.35 MB
PDF icon Topographical Plan820.83 KB
PDF icon Fire Safety Strategy Plan - SUPERSEDED437.51 KB
PDF icon Street Scene AA - SUPERSEDED7.79 MB
PDF icon Street Scene BB7.87 MB
PDF icon House Type Brochure - SUPERSEDED4.02 MB
PDF icon Transport Statement - SUPERSEDED8.33 MB
PDF icon Engineering Layout - Sheet 1 - SUPERSEDED1.69 MB
PDF icon Engineering Layout - Sheet 2 - SUPERSEDED1.44 MB
PDF icon Engineering Layout - Sheet 3 - SUPERSEDED747.32 KB
PDF icon SuDs Maintenance Plan - SUPERSEDED1.55 MB
PDF icon Detention Basin Details - SUPERSEDED542.32 KB
PDF icon Flood Risk Assessment and Drainage Strategy - SUPERSEDED1.61 MB
PDF icon Flood Risk Assessment and Drainage Strategy (Appendices) - SUPERSEDED15.84 MB
PDF icon Affordable Housing Statement289.1 KB
PDF icon Arboricultural Impact Assessment6.53 MB
PDF icon Biodiversity Net Gain5.02 MB
PDF icon The Caldew M4(2) Semi883.6 KB
PDF icon The Dee M4(2) NG603.94 KB
PDF icon The Derwent M4(2) NG751.95 KB
PDF icon The Derwent M4(2) SG842.8 KB
PDF icon The Eden M4(2)979.22 KB
PDF icon The Ellen M4(2) NG910.31 KB
PDF icon The Ellen M4(2) SG956.19 KB
PDF icon The Gelt Semi NG1.13 MB
PDF icon The Petterill M4(2) Semi1.1 MB
PDF icon The Whillan TF DG M4(2)986.71 KB
PDF icon The Whillan SG M4(2)1.02 MB
PDF icon The Wreay TF M4(2)910.31 KB
PDF icon Phase 1: Desk Top Study Report and Mining Risk Assessment - SUPERSEDED11.99 MB
PDF icon Desk-based Assessment1.69 MB
PDF icon Assessment of Visibility Splays130.05 KB
PDF icon Swept Paths of Refuse Vehicle Using Accesses268.22 KB
PDF icon Swept Paths of Refuse Vehicle Turning Within Site377.26 KB
PDF icon Schedule of Quantities for BNG - SUPERSEDED121.98 KB
PDF icon Landscape Plan - SUPERSEDED8.83 MB
PDF icon Tree Survey and Schedule2.97 MB
PDF icon Tree Schedule8.25 KB
PDF icon Site Images2.49 MB
PDF icon Tree Location Plan1.03 MB
PDF icon Preliminary Ecological Appraisal9.85 MB
PDF icon Planning Statement806.3 KB
PDF icon Design and Access Statement - SUPERSEDED12.58 MB
PDF icon Affordable Housing Plan - Amended Details September 2025424.85 KB
PDF icon Archaeological Written Scheme of Investigation Evaluation 2025 - Amended Details September 20251.06 MB
PDF icon Boundary Treatment Plan - Amended Details September 2025410.75 KB
PDF icon Car Parking Plan - Amended Details September 2025423.99 KB
PDF icon Design and Access Statement - Amended Details September 202517.11 MB
PDF icon Detention Basin Details - Amended Details September 2025983.81 KB
PDF icon Engineering Layout Sheet 1 - Amended Details September 20251.88 MB
PDF icon Engineering Layout Sheet 2 - Amended Details September 20251.48 MB
PDF icon Engineering Layout Sheet 3 - Amended Details September 2025749.58 KB
PDF icon Fire Safety Plan - Amended Details September 2025481.36 KB
PDF icon Flood Risk and Drainage Strategy - Amended Details September 202511.77 MB
PDF icon Garden Areas Plan - Amended Details September 2025443.94 KB
PDF icon Schedule of Quantities for BNG Rev B - Amended Details September 2025127.67 KB
PDF icon Landscape Plan - Amended Details September 20258.93 MB
PDF icon House Materials Plan - Amended Details September 2025489.85 KB
PDF icon House Type Brochure - Amended Details September 20253.05 MB
PDF icon Housing Schedule Plan - Amended Details September 2025660.79 KB
PDF icon Phase 2 Ground Investigation Report - Amended Details September 20258.42 MB
PDF icon Plant Schedule - Amended Details September 2025675.03 KB
PDF icon Refuse and Recycling Plan - Amended Details September 2025728.2 KB
PDF icon Section 38 - Amended Details September 20251.23 MB
PDF icon Shadow Habitat Regulations Assessment - Amended Details September 2025720.19 KB
PDF icon Site Framework Plan - Amended Details September 20252.29 MB
PDF icon Site Illustrative Masterplan - Amended Details September 20255.04 MB
PDF icon Site Location Plan - Amended Details September 2025180.69 KB
PDF icon Site Massing Plan - Amended Details September 2025428.86 KB
PDF icon Street Scene AA - Amended Details September 20257.74 MB
PDF icon SuDS Maintenance Plan - Amended Details September 20251.55 MB
PDF icon Surface Materials Plan - Amended Details September 2025777.87 KB
PDF icon Transport Statement - Amended Details September 20251.16 MB
PDF icon Consultee Response - Housing Team 01/04/2025150.04 KB
PDF icon Consultee Response - Active Travel England 04/04/2025747.98 KB
PDF icon Consultee Response - Historic Environment Officer 07/04/2025195.19 KB
PDF icon Consultee Response - Cleator Moor Town Council 09/04/2025114.04 KB
PDF icon Consultee Response - Arboricultural Report 11/04/2025122.86 KB
PDF icon Consultee Response - Natural England 14/04/2025167.89 KB
PDF icon Consultee Response - Conservation and Design Officer 22/04/2025547.36 KB
PDF icon Consultee Response - Environmental Health 25/04/2025745.24 KB
PDF icon Consultee Response - Designing Out Crime Officer 25/04/2025882.98 KB
PDF icon Consultee Response - Highways 29/04/2025190.24 KB
PDF icon Consultee Response - United Utilities 09/05/2025305.46 KB
PDF icon Consultee Response - Education Response 25/06/2025 (SUPERSEDED BY RESPONSE ON 09/07/2025)340.38 KB
PDF icon Consultee Response - Ecology Team 02/07/2025169.53 KB
PDF icon Consultee Response - Education Response 09/07/2025205.88 KB
PDF icon Consultee Response - Active Travel England 11/09/20251 MB
PDF icon Consultee Response - Housing Team 11/09/2025124.56 KB

Comment on this Application

Your representation will be submitted to the planning authority and will be available for public inspection.

CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
Image CAPTCHA
Enter the characters shown in the image.