DEMOLITION OF GARAGE WITH PROPOSED TWO STOREY SIDE EXTENSION WITH RAISED FIRST FLOOR BALCONY TO FRONT & REAR ELEVATIONS WITH LINK ALONG SIDE ELEVATION. REMOVAL OF EXISTING SEPTIC TANK AND INSTALLATION OF WASTE WATER TREATMENT PLANT IN NEW LOCATION
REPLACE THE EXISTING ROTTEN WHITE PAINTED TIMBER WINDOWS AND REPLACE WITH THE SAME STYLE WHITE PAINTED TIMBER WINDOWS; REPLACE DRY STONE RETAINING WALL TO REAR WITH CONCRETE BLOCK COVERED IN RENDER WALL WITH FRENCH DRAIN